Sub-Saharan Africa excluding South Africa | Dealing with construction permits, cost (% of income per capita)
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.
Publisher
The World Bank
Origin
Sub-Saharan Africa excluding South Africa
Records
53
Source
Sub-Saharan Africa excluding South Africa | Dealing with construction permits, cost (% of income per capita)
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
1835.17674419 2005
1725.44318182 2006
3206.425 2007
2729.16590909 2008
1339.42045455 2009
1099.63409091 2010
888.37954545 2011
767.90909091 2012
Sub-Saharan Africa excluding South Africa | Dealing with construction permits, cost (% of income per capita)
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.
Publisher
The World Bank
Origin
Sub-Saharan Africa excluding South Africa
Records
53
Source